Dear [FNAME]
NEWS
6.5 km Z-Morh tunnel will be inaugurated by next month
Amit Shah to lay foundation stone of Rs 2,414 cr development projects
PNC Infra bags Rs 819 crore Highway project
EQUIPMENT ARTICLE
Access equipment foreseeing momentum due increasing demand in construction, infrastructure and maintenance applications. Access equipment provides........
Rann infra rental telehandlers can be used to work in the most difficult conditions and terrains. Equipped with a telescopic boom it allows heavy loads to be lifted at great heights and ........
EQUIPMENT FEATURE
The vibratory system is key to the success of the Ammann ARS 110.2 Soil Compactor. The robust, four-bearing system maximises output...........
TENDERSHOP
Rehabilitation of Existing bridge near Holehonnuru at Km 511 Km 511 8 of NH 13
Improvements to Chennalode Oottupara road Km 0.000 to 12.325 in Wayanad
Construction of ROB and their Approaches at Km 99 of NH 744
Previous Week Equipment In-Brief
Construction In-Brief
Follow Us
Constrofacilitator
Unsubscribe | Privacy Policy